Planning Optimization Quiz

5 questions Pass: 70% +25 pts (50 with Pro)

Quiz covering Advanced Master Planning

What you'll be asked

  1. Which of the following is the primary benefit of using Planning Optimization over the deprecated built-in master planning engine in Dynamics 365 Supply Chain Management?
  2. When configuring a Planning Optimization run, what is the purpose of the 'Master plan' parameter?
  3. If you need to ensure that a specific item is always replenished based on a minimum stock level, which coverage setting should be utilized within the Planning Optimization setup?
  4. What happens to planned orders generated by Planning Optimization if they are not firm-planned before the next master planning run?
  5. In a complex multi-site environment, you notice that Planning Optimization is ignoring cross-docking rules during a specific plan run. What is the most likely cause?

Answers and explanations come after you submit.